HBU Logistics Planning for the Construction of the P 381 Multi Mission Dry Dock Essay
Description
Describe logistics planning for a real construction project case. Identify on-going or nearly completed construction projects anywhere in the world.
Discuss minimum 10 of the following planning aspects:
1. Project description with photos, videos, or any visual materials (sketches or drawings)
2. What aspects of selection of mode of transport/ planning are required?
3. How do you select ocean carriers for the project?
4. How do you select trucking companies for the project?
5. How would you utilize the services of a customs broker?
6. How would select airfreight services?
7. Identify the company or companies in charge of the construction project. Describe your findings.
8. Identify the logistics activities you actually observed (with visual evidence) and their working
schedules. (If observations are not feasible, make estimates with educated guesses.)
9. Identify logistics workers and/or logistics contractors and their roles. Discuss the processes
logistics workers/contractors actually perform (e.g. waste collection and transfer).
10. Engineering and designs
11. Procurement
12. Materials handling
13. Construction schedules
14. Workers and contractors management
15. Scheduling
16. Logistics and waste management processes
17. Needed resources for project logistics
APA format: 5 pages at MAXIMUM of content with cover page, references, exhibits, and texts; 12 points font size; double spaced
Have a similar assignment? "Place an order for your assignment and have exceptional work written by our team of experts, guaranteeing you A results."